| Projects Executed by JPME with Special Characteristics From
2000 Till 2005 |
| |
| Sl. |
Item |
Quantity |
Customer |
Enduser |
Project |
Design |
Design |
Material of |
Code |
Size (mm) |
PWHT |
Weight in Kg / Item |
| No |
Description |
Code |
Pressure (psig) |
Construction |
Stamp |
Dia |
Thk |
Length |
|
| Length: |
| 1 |
Clauspol Reactor |
1 |
Technip |
KNPC |
Tail Gas Treating Unit |
ASME SEC VIII Div.1 |
50 |
SA 516 Gr 70N |
U |
9601 |
22/24 |
49000 |
Nil |
557,000 |
| 2 |
LP Dry/Wet Crude Seperator |
2 |
Petrofac |
KOC |
Upgrading of Gathering Centre -
23 |
ASME SEC VIII Div.1 |
75.4 |
SA 516 Gr 70 |
U |
4300 |
19 |
31800 |
Nil |
78,415 |
| 3 |
First & Second Stage Crude
Desalter |
2 |
Petrofac |
KOC |
Upgrading of Gathering Centre -
23 |
ASME SEC VIII Div.1 |
304.6 |
SA 516 Gr 70 (Monel Overlay) |
U |
3650 |
32 |
27100 |
Nil |
86,300 |
| Weight |
| 4 |
Clauspol Reactor |
1 |
Technip |
KNPC |
Tail Gas Treating Unit |
ASME SEC VIII Div.1 |
50 |
SA 516 Gr 70N |
U |
9601 |
22/24/25 |
49000 |
Nil |
557,000 |
| 5 |
Crude Oil Heater |
2 |
Fire-Tech |
KOC |
Replacement of Crude oil heater
at GC - 17 |
ASME SEC VIII Div.1 |
58.02 |
SA 204 Gr B |
U |
4270 |
15 |
10967 |
YES |
110,000 |
| 6 |
Filter Coalesscer |
1 |
Peco |
Qatar Petr. |
Dukhan Arab 'D' Gas Plant |
ASME SEC VIII DIV. 2 |
1087.5 |
SA 516 Gr 65 + Inconel 625 Clad |
U2 |
3200 |
82.5+5 |
8496 |
YES |
100,000 |
| Thickness |
| 7 |
Charcoal Absorbers |
4 |
Snam |
KOC |
Installation of New BS-131 and
Interconnection Lines with GC's & BS-131 |
ASME SEC. VIII Div. 2 |
1339 |
SA 516 Gr. 60N |
U2 |
3000 |
112 |
4700 |
YES |
87,450 |
| 8 |
Charcoal Absorbers |
4 |
Prosernat |
KOC |
Rebuilding of
Damaged Facility at GC-15 & BS-130 |
ASME SEC. VIII DIV. 1 |
1339 |
SA 516 Gr 70 |
U2 |
3000 |
95 |
5192 |
YES |
60,000 |
| 9 |
Filter Coalesscer |
1 |
Peco |
Qatar Petr. |
Dukhan Arab 'D' Gas Plant |
ASME SEC VIII DIV. 2 |
1087.5 |
SA 516 Gr 65 + Inconel 625 Clad |
U2 |
3200 |
82.5+5 |
8496 |
YES |
100,000 |
| Diameter |
| 10 |
Clauspol Reactor |
1 |
Technip |
KNPC |
Tail Gas Treating Unit |
ASME SEC VIII Div.1 |
50 |
SA 516 Gr 70N |
U |
9601 |
22/24 |
49000 |
Nil |
557,000 |
| 11 |
LP Dry/Wet Crude Seperator |
2 |
Petrofac |
KOC |
Upgrading of Gathering Centre -
23 |
ASME SEC VIII Div.1 |
75.4 |
SA 516 Gr 70 |
U |
4300 |
19 |
31800 |
Nil |
78,415 |
| 12 |
Inlet LP Gas
Scrubber |
1 |
Fluor |
KOC |
Rebuilding of
Damaged Facility at GC-15 & BS-130 |
ASME SEC. VIII Div. 1 |
95 |
SA 516
Gr. 60N HIC,NACE |
U |
4270 |
22/20/18 |
12497 |
YES |
51,590 |
| Speciality Material |
| 13 |
First & Second Stage Crude
Desalter |
2 |
Petrofac |
KOC |
Upgrading of Gathering Centre -
23 |
ASME SEC VIII Div.1 |
304.6 |
SA 516 Gr 70 (Monel Overlay) |
U |
3650 |
32 |
27100 |
Nil |
86,300 |
| 14 |
HP Gas Compressor Suction Scrubber |
1 |
Fluor |
KOC |
Rebuilding of
Damaged Facility at GC-15 & BS-130 |
ASME SEC. VIII Div. 1 |
505 |
SA 516 Gr. 70N + SS316L Clad |
U |
3731 |
49+3 |
11735 |
YES |
88,000 |
| 15 |
HP Gas Compressor Discharge
Scrubber |
1 |
Fluor |
KOC |
Rebuilding of
Damaged Facility at GC-15 & BS-130 |
ASME SEC. VIII Div. 2 |
1015 |
SA 516 Gr. 70N + SS316L Clad |
U2 |
2745 |
63+3 |
10490 |
YES |
74,325 |
| 16 |
Filter Coalesscer |
1 |
Peco |
Qatar Petr. |
Dukhan Arab 'D' Gas Plant |
ASME SEC VIII DIV. 2 |
1087.5 |
SA 516 Gr 65 + Inconel 625 Clad |
U2 |
3200 |
82.5+5 |
8496 |
YES |
100,000 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|